Alloy Steel Fittings

Thick-wall alloy steel butt weld fittings with a grey oxidised surface, an elbow and a tee

Chrome-moly alloy steel butt weld fittings to ASTM A234 in WP5, WP9, WP11, WP12, WP22 and WP91 for high temperature and hydrogen service.

ASTM A234

Send an enquiry

We reply with availability and pricing within one business day.

  • Standard: ASTM A234, ASME B16.9, ASME B16.25, ASTM A182, NACE MR0175
  • Grades: WP5, WP9, WP11, WP12, WP22, WP91, WP92, F11, F22, F91
  • Certificate: EN 10204 3.1 with every order, 3.2 on request

Mejor Steel is the export agent for the mills that make your material: one contract, one delivery date, and the mill named on the quotation. How we supply

Send an enquiry

We reply within one business day, Monday to Friday 09:00-18:00 CST. Or write to info@mejorsteel.com / WhatsApp.

Specifications

Outer diameter1/2" - 48" (DN15 - DN1200)
Wall thicknessSCH 10 - XXS
ScheduleSCH 10 to XXS, heavy wall available
LengthCenter to end per ASME B16.9
EndsBevelled to ASME B16.25, or smooth finish
Surface treatmentBlack, varnish, or protective coating
Manufacturing processSeamless, forged and machined, or welded
Pressure ratingPer ASME B16.9 wall thickness and ASME B31.3

Reading the Chrome-Moly Grades

Chrome-moly grades are named by their chromium and molybdenum content, and the grade choice is driven by design temperature and by hydrogen partial pressure. WP11 is 1-1/4Cr-1/2Mo and is the most widely used grade, covering refinery piping up to about 550 degrees Celsius. WP22 is 2-1/4Cr-1Mo, with higher creep strength at elevated temperature and better resistance to hydrogen attack, used in hydrocracker and hydrotreater circuits. WP5 is 5Cr-1/2Mo and WP9 is 9Cr-1Mo, both used in higher temperature and more corrosive refinery service. WP91, which is 9Cr-1Mo-V, has substantially higher creep strength than WP22 and allows thinner walls at the same temperature and pressure, which is why it dominates modern high energy piping in power plants. The addition of vanadium and niobium in WP91 is what provides the improved creep performance, and it also makes the material more sensitive to welding heat input.

Alloy steel butt weld fittings in a high-temperature process piping line
Concept image: chrome-moly fittings are chosen by chromium and molybdenum content, design temperature and hydrogen pressure.

Why PMI Matters More Here

Alloy steel fittings look and weigh almost the same as carbon steel fittings, and a grade substitution between WP11 and carbon steel WPB, or between WP22 and WP11, would not be visible on the rack. The consequence, however, is serious: an incorrect grade in a high temperature hydrogen line can fail by hydrogen attack or by creep rupture at temperatures well below the design condition, and the failure can be catastrophic. For this reason, positive material identification is not optional on chrome-moly fittings. X-ray fluorescence or optical emission spectrometry is used to measure the chromium and molybdenum content of every fitting, and the readings are recorded on the mill certificate. Some specifications also require hardness testing and, for thick sections, full heat treatment records. When ordering alloy steel fittings, state the requirement for PMI explicitly, and confirm the acceptance criteria for the measured chemistry.

Alloy fittings: chrome content is the specification

Chrome-moly fittings are made to A234 and the WP number states the chrome and molybdenum content, exactly as it does for the pipe. Because the chemistry is what gives the fitting its high temperature and hydrogen resistance, positive material identification on the finished fitting is a normal requirement rather than an extra.

Where the fitting sitsWhat it fixes in the specificationWhat to state on the enquiry
Steam or high temperature lineWP11 or WP22, to match the A335 pipethe pipe grade and the design temperature
Hydrogen or hydroprocessing serviceThe chrome content is set by the hydrogen partial pressurethe partial pressure and the operating temperature
Refinery hydrocracker or reformerWP9, WP91 or WP92 for the higher gradesthe project specification
Sour serviceRestricted hardness applies to the fitting as well as the pipeNACE MR0175
Verification requirementPMI is the standard check on chrome and molybdenum contentwhether PMI is required, and to which standard
Heavy wall or thick sectionForged and machined blanks are used at the larger sizesthe size and the wall
Field welding of P91 or P92Controlled heat treatment is mandatory after weldingwhether post weld heat treatment is required
Impact requirementCharpy testing where the design calls for itthe test temperature

What is the difference between WP11, WP22 and WP91?

WP11 is 1-1/4Cr-1/2Mo, used for general refinery high temperature piping up to about 550 degrees Celsius. WP22 is 2-1/4Cr-1Mo with higher creep strength and better hydrogen resistance, used in hydroprocessing circuits. WP91 is 9Cr-1Mo-V with much higher creep strength, allowing thinner walls at the same condition, and is the standard for modern power plant high energy piping. The grade is selected from a design temperature and hydrogen partial pressure evaluation, not from preference.

Is PMI required on alloy steel fittings?

In practice, yes. Alloy steel and carbon steel fittings are visually indistinguishable, so without PMI there is no way to confirm that a WP11 fitting is not actually WPB, or that a WP22 is not actually WP11. In high temperature hydrogen service a wrong grade can fail by hydrogen attack or creep. We perform PMI on every alloy steel fitting and report the measured chemistry on the certificate.

Grades supplied

The grade fixes the minimum strength and the chemistry. Select a grade for its full composition and mechanical tables.

  • WP5
  • WP9
  • WP11
  • WP12
  • WP22
  • WP91
  • WP92
  • F11
  • F22
  • F91

Download Alloy Steel Fittings data sheet (PDF) One page: supply range, grades and key sizes, what to state on the enquiry, and the inspection documents that come with the order. The standard is the governing document.

Materials

  • 1-1/4Cr-1/2Mo
  • 2-1/4Cr-1Mo
  • 5Cr-1/2Mo
  • 9Cr-1Mo
  • 9Cr-1Mo-V

Typical applications

  • Refinery and hydrocracker piping
  • Hydrogen and hydrodesulfurization units
  • Power plant high temperature steam lines
  • Petrochemical high temperature service
  • Sour service in oil and gas

Inspection & testing

  • PMI to verify chrome and moly content
  • Dimensional inspection per ASME B16.9
  • Radiographic or ultrasonic examination
  • Hardness testing
  • Charpy impact testing
  • Third-party inspection (SGS, BV, TUV)
PackagingSea-worthy export packing: wooden cases or pallets, tagged with size, grade and heat number; corrosion protection on request.
MOQBy piece - mixed sizes accepted; no minimum on standard items.
Lead timeStock items: 5-10 days. Made to order: 3-5 weeks after order confirmation.

Payment: T/T 30% deposit with the balance before shipment; L/C at sight also accepted. Final terms are confirmed on the quotation.

How we supply: sourced through partner mills; the producing mill is named on the quotation. How we supply sets out who is accountable for the order.

Need this product? Send the size, grade, quantity and destination port and we will reply with availability and pricing.

Request a quotation
WhatsApp
Send an enquiry WhatsApp
Send an enquiry