Lap Joint Flange

Two lap joint flange rings on a dark backdrop, plain flat rings with bolt holes and no hub on either side

Lap joint flanges to ASME B16.5 used with ASME B16.9 stub ends - the flange is free to rotate for bolt hole alignment and only the stub end touches the fluid.

ASME B16.5

Send an enquiry

We reply with availability and pricing within one business day.

  • Standard: ASME B16.5, ASME B16.9, ASTM A105, ASTM A182, ASTM A350
  • Grades: A105, A350 LF2, F304, F304L, F316, F316L, F321, F51
  • Certificate: EN 10204 3.1 with every order, 3.2 on request

Mejor Steel is the export agent for the mills that make your material: one contract, one delivery date, and the mill named on the quotation. How we supply

Send an enquiry

We reply within one business day, Monday to Friday 09:00-18:00 CST. Or write to info@mejorsteel.com / WhatsApp.

Specifications

Outer diameter1/2" - 24" to ASME B16.5
SchedulePipe schedule carried by the matching ASME B16.9 stub end, not by the flange
LengthFlange thickness per ASME B16.5; the stub end has its own length to ASME B16.9
EndsRaised face (RF) or flat face (FF); the joint is made at the stub end lap
Surface treatmentBlack oxide, anti-rust oil, hot dip galvanized, or machined finish
Manufacturing processForged and machined; stub ends are seamless or welded butt weld fittings
Pressure ratingClass 150, 300, 600 (higher classes available on request)
Connection typeStub end butt welded to the pipe; the flange is loose behind the stub end lap

ASME B16.5 Class 150 flange dimensions

Flange outside diameter, minimum flange thickness, bolt circle, bolting and raised face, in millimetres, for NPS 1/2 to 12 in. These dimensions are set by the size and the pressure class and are common to the flange types on this line; the bore, hub, socket or thread detail changes with the type and is confirmed on the drawing or the quotation. Thickness includes the 1.6 mm raised face.

NPSDNFlange OD
(mm)
Min. thickness
(mm)
Bolt circle / PCD
(mm)
BoltsBolt sizeHole dia
(mm)
Raised face dia
(mm)
1/21588.911.260.54M1415.934.9
3/42098.612.769.94M1415.942.9
125108.014.379.44M1415.950.8
1-1/432117.515.988.94M1415.963.5
1-1/240127.017.598.64M1415.973.0
250152.419.1120.74M1619.192.1
2-1/265177.822.4139.74M1619.1104.8
380190.523.9152.44M1619.1127.0
3-1/290215.923.9177.88M1619.1139.7
4100228.623.9190.58M1619.1157.2
5125254.023.9215.98M2022.2185.7
6150279.425.4241.38M2022.2215.9
8200342.928.4298.58M2022.2269.9
10250406.430.2362.012M2425.4323.9
12300482.631.8431.812M2425.4381.0

Data to ASME B16.5; confirm against the project specification before fabrication. Sizes above 12 in and Class 300 to 2500 follow the same layout and are quoted against the specification. Send the size, class, facing and destination port and we will confirm availability and price within one business day.

What a Lap Joint Flange Is

A lap joint flange is a two piece connection. The pipe is butt welded to an ASME B16.9 stub end, and the flange itself is a plain ring that sits behind the flared lap of the stub end. The flange is not welded to anything – the bolting pulls it against the mating flange and the metal-to-metal contact between the flange face and the stub end lap provides the seal. Because the flange is loose, it can be rotated freely to line up the bolt holes, and because it never touches the fluid, it can be a different material from the pipe.

Why Use a Lap Joint Instead of a Weld Neck

Two practical reasons. First, bolt hole alignment: if a spool has to be dropped in between two existing flanges, a rotating flange removes the need to cut and re-weld anything to index the holes. Second, material cost: on a stainless or alloy line the flange is the heaviest single piece of material in the joint, and a lap joint flange is not wetted, so a carbon steel flange can be used behind a stainless stub end – the expensive material is confined to the part that actually touches the process fluid. Lap joints are also convenient where a section has to be opened for cleaning or inspection.

The Stub End Is Part of the Order

A lap joint flange cannot be installed without a matching stub end, so the two are normally ordered together. The stub end carries the pipe schedule and the butt weld to the pipe; the flange only carries the class, the facing and the bolt pattern, and the two must be the same size and class. Stub ends are dimensioned to ASME B16.9 and are made in two lengths, short and long, so the length has to be stated. Supplying the pair together avoids the common problem of a flange arriving without a stub end that fits it.

Section through a lap joint: the pipe butt welded to a stub end with a flared lap, and a loose ring flange held by the bolting
The stub end takes the fluid and the wear, while the loose ring rotates to align the bolt holes and can be a different material from the pipe. Source: this page’s lap joint section.

Where It Is Used and Its Limits

Lap joint flanges are common on stainless and corrosive service, on lines that have to be opened for cleaning, and on spools that must fit between fixed flanges. The usual limit is pressure: because the seal depends on the metal contact between the flange face and the stub end lap, lap joints are normally used at the lower classes, most often Class 150 and 300. They are not the choice for high pressure, for severe cyclic service, or for large sizes where the bolting load on the lap becomes heavy.

Do I need a stub end with a lap joint flange?

Yes. The lap joint flange is only a loose ring; the pipe is welded to a stub end and the flange sits behind the stub end lap. Without a matching stub end of the same size and class the flange cannot be installed. We normally quote both together so that they arrive as a matched pair.

Why use a lap joint flange on a stainless steel line?

Because the flange is not wetted. Only the stub end contacts the process fluid, so the flange can be carbon steel while the stub end is stainless – the expensive alloy is limited to the smaller part. It also lets the flange rotate to align bolt holes with an existing flange.

What pressure class can a lap joint flange be used at?

ASME B16.5 tabulates lap joint flanges across the full class range, but in practice they are used at the lower classes, most commonly Class 150 and 300, because the joint seal depends on the metal contact between the flange face and the stub end lap. For high pressure or severe cyclic service a weld neck flange is the better choice.

Are short and long pattern stub ends both available?

Yes. ASME B16.9 stub ends come in short and long patterns, and the two are not interchangeable in a spool layout, so the pattern has to be stated with the order. If the stub end is being replaced in an existing line, measure the existing one before ordering.

Lap joint against slip on: which one to order

Both types are used at the lower pressure classes, and on a spool list they look interchangeable. They are not: one is a single item with two fillet welds, the other is a pair of items with a butt weld.

Point of comparisonLap jointSlip on
Number of partsTwo: the flange and an ASME B16.9 stub endOne
Weld to the pipeButt weld on the stub endTwo fillet welds, inside and outside
Weld examinationThe butt weld can be radiographed or ultrasonically testedFillet welds only; dye penetrant or magnetic particle testing
Bolt hole alignmentThe flange rotates independently of the welded part, at any timeThe flange rotates only before it is welded
Material cost on an alloy lineThe flange is not wetted, so a carbon steel flange can sit behind a stainless stub endThe whole flange is the line material
Typical pressure classLower classes, most often Class 150 and 300Lower classes, utility service
Where it winsSpools that have to drop between fixed flanges, alloy lines, sections opened for cleaningStraight runs where simplicity and cost matter
Extra items to orderStub end, in the correct pattern and scheduleNone

Stub end: what has to be stated and what has to be measured

The stub end carries the pipe schedule and the butt weld to the pipe, so it is a pipe item rather than a flange item, and it is dimensioned to ASME B16.9.

  • Pattern. Short and long pattern stub ends are both tabulated, and they are not interchangeable in a spool layout. The pattern has to be on the order.
  • Schedule. The stub end follows the pipe schedule, not the flange class. A Class 300 flange and a Schedule 40 stub end are a normal combination.
  • Lap dimensions. The lap outside diameter and thickness have to match the flange behind it. Mixing a stub end from one source with a flange from another is where mismatch is most often found.
  • Replacement in an existing line. Measure the existing lap diameter, lap thickness and overall length before ordering. Nominal dimensions are tabulated, but a line that has been in service may have been built to a different pattern.
  • Gasket. The gasket sits between the stub end lap and the mating flange face, so it is dimensioned by the facing and class of the mating flange rather than by the lap.

Grades supplied and minimum properties

The grade fixes the minimum strength and the chemistry. The table below gives the requirements that separate the forged flange material grades ordered most often; the full composition and mechanical table for each grade is on its own page.

GradeYield strengthTensile strength
A105 (forged carbon steel)250 MPa (36,000 psi)485 MPa (70,000 psi)
F316 (forged stainless steel)205 MPa min (30,000 psi)515 MPa min (75,000 psi)

The complete chemistry and mechanical table for each grade, with the notes that qualify it, is on the individual grade page – for example ASTM A105 flange. The stainless grade has the higher tensile requirement but the lower minimum yield strength, so the two are not interchangeable on the strength table alone. On a lap joint the flange and the stub end are separate items and may be ordered in different materials.

Source: specified minimum yield and tensile strength for each grade, per ASTM A105 / ASME SA105 and ASTM A182 / ASME SA182. The standard named against each grade is the governing document.

Download Lap Joint Flange data sheet (PDF) One page: supply range, grades and key sizes, what to state on the enquiry, and the inspection documents that come with the order. The standard is the governing document.

What decides the price

There is no list price for flanges: the same drawing can be quoted at different numbers depending on seven things. Send them and the quotation comes back within one business day.

FactorWhy it moves the priceWhat to send
Material gradeCarbon A105 is the baseline; F316, F51 and alloy grades cost more and take longer to sourceThe grade, or the line class
Size and pressure classWeight and forging time rise with bothNPS and class
FacingRTJ and special facings add machiningRF, FF or RTJ
Bore or scheduleA weld neck is bored to the pipe wall, so the schedule is part of the priceThe pipe schedule
QuantitySetup is spread over the pieces; a small lot carries more per piecePieces, or total weight
Inspection and certificateEN 10204 3.2 and third-party inspection add cost and time3.1 or 3.2, and whether SGS, BV or TUV is required
Destination and IncotermFreight and packing follow the portDestination port, FOB / CFR / CIF

Reply within one business day. Send the seven items above with the quantity and the destination port. Send the specification or WhatsApp the specification.

Materials

  • Forged carbon steel
  • Forged stainless steel
  • Duplex stainless steel

Typical applications

  • Corrosive and stainless steel lines
  • Lines where bolt holes must line up with an existing flange
  • Piping that has to be dismantled for cleaning or inspection
  • Sections where flange orientation must be adjustable on site
  • Cost saving on alloy or stainless pipework

Inspection & testing

  • Dimensional inspection per ASME B16.5
  • Stub end dimensions per ASME B16.9
  • Chemical and mechanical testing per ASTM
  • PMI on alloy and stainless steel
  • Hardness testing
  • Third-party inspection (SGS, BV, TUV) on request
PackagingSea-worthy export packing: wooden cases or pallets, tagged with size, grade and heat number; corrosion protection on request.
MOQBy piece - mixed sizes accepted; no minimum on standard items.
Lead timeStock items: 5-10 days. Made to order: 3-5 weeks after order confirmation.

Payment: T/T 30% deposit with the balance before shipment; L/C at sight also accepted. Final terms are confirmed on the quotation.

How we supply: sourced through partner mills; the producing mill is named on the quotation. How we supply sets out who is accountable for the order.

Need this product? Send the size, grade, quantity and destination port and we will reply with availability and pricing.

Request a quotation
WhatsApp
Send an enquiry WhatsApp
Send an enquiry